NASA ISS On-Orbit Status 10 June 2013 New Status: Light Microscopy Module (LMM) Configuration: Flight Engineer (FE)-3 Cassidy completed the LMM reconfiguration for the next use of the Fluids and Combustion Facility (FCF) for the Advanced Colloids Experiment (ACE) payload.
June 11, 2013 - SpaceRef
'I knew at least it was going to be a really long day' Hours into a rescue mission that saw a flight engineer wounded and their aircraft peppered with bullets, the pilots of two Pave Hawk helicopters polled their crews before going back into the fray.
June 10, 2013 - Stars and Stripes
NASA ISS On-Orbit Status 7 June 2013 New Status: Multi-purpose Small Payload Rack (MSPR) Combustion Chamber (CC) Leak Check: Flight Engineer (FE)-3 Cassidy successfully performed the final portion of the MSPR CC leak check today.
June 8, 2013 - SpaceRef